Top

Start Date: March 2005
Completion Date: April 2005
Client: Aquapure Water, Ltd. Nassau, Bahamas

Aquapure Water, Ltd. contracted with Aerex® Industries, Inc. to design and manufacture a 100,000 GPD BWRO system to increase their existing capacity. The skid mounted unit is designed to operate at 70 percent recovery with a feed water up to 3500 ppm TDS and an SDI of three or less. Using Toray TM720-370 membrane elements, the unit operates at a feed pressure of 200 psi and produces permeate below 100 ppm TDS.

The unit frame was fabricated using Extren extruded fiberglass shapes with 316L stainless steel feed and concentrate piping. Protec PRO 8-300-SP pressure vessels, a Grundfos feed pump and Signet instrumentation are just a few of the major components of the system. Aerex’s® scope of services included system design, fabrication, controls and installation supervision. All engineering support and construction for this project was provided by Aerex’s® Fort Pierce, Fla facility.